How to assemble a shower cabin - many assemblers do not know this! Do-it-yourself installation of a shower cabin Assembly of a shower cabin with a deep tray

Bulky heavy bathtubs have long begun to lose ground to a more modern solution, namely showers. They are a great option for many homes for several reasons. Firstly, space in the bathroom is saved, as the shower cabin has a compact vertical placement, which allows you to place additional accessories on the area. Secondly, the versatility of the design allows not only to take a standard shower, but also to enjoy various types of hydromassage and a rain shower built into the miracle device. So, there is no doubt about the practicality of the acquisition. Only one question remains - is it possible to install a shower cabin with your own hands? Quite! To do this, you need only two things - carefully study the manufacturer's instructions and take into account the recommendations from this article.

What is a shower cabin

Each manufacturer produces several types of shower designs with their own features, for example, an audio system and a control panel. However, most showers are angular in shape and consist of a standard set of basic elements:

  • pallet with apron;
  • back panel;
  • side walls with vertical posts;
  • sliding door;
  • roofs.

What you need to install a shower cabin

Note! The shower cabin can only be installed on a waterproofed, absolutely flat surface. Therefore, you should take care of the preparatory work in advance.

To install a shower cabin with your own hands, you need to stock up on several tools:

  • silicone sealant. It is not always needed - there are models that exclude water leakage;
  • various screwdrivers;
  • flexible hoses;
  • fum tape (can be replaced with tow);
  • electric drill;
  • wrench;
  • building level;
  • special pistol.

In the process, you will also need additional little things - a knife, gloves, nuts with washers and self-tapping screws.

Important! Before starting all work, it is necessary to make sure that all parts of the shower cabin, especially glass, are present and intact.

It is hardened, so when struck, small pieces fly apart, the ringing of which will be clearly audible even in a packed box.

Step-by-step assembly and installation of a shower cabin with your own hands

In order for the installation to be as convenient as possible, it should be started from the bottom and gradually rise up.

Pallet assembly

Trays for hydromassage boxes can be made of various materials and, accordingly, the assembly of some structures will have its own characteristics.

  • Enamelled steel. It is a solid construction that can last a very long time. But there were cases when, during work, it was deformed from its weight. And as a result, there was damage to the enamel. Another disadvantage is poor heat storage;
  • Processed cast iron. Very effective at retaining heat despite the time taken to heat it up. To protect against the influence of the external environment and the appearance of corrosion, it is usually covered with enamel. The peculiarity of installing a cast-iron pallet lies in the difficulties associated with its heavy weight;
  • Faience (ceramics), marble (artificial stone). What these two material categories have in common is that they are both ideal for installation in shower enclosures. Both faience and marble have an attractive appearance, heat up quickly, are able to keep heat for a long time and have excellent wear resistance. However, the technology of their production is very expensive, which naturally affects the selling price. It should be noted that these materials are very brittle and upon impact they are simply destroyed;
  • Kvaril is a mixture of acrylic and quartz. Such material for reinforced pallets is considered one of the best in its properties. It is only slightly inferior to ceramic. And strength and excellent thermal insulation is achieved thanks to quartz, which is part of the structure of this material;
  • Glass;
  • Tree;
  • Plastic, acrylic. It is the most widely available material on the market. However, during operation, it cannot boast of its optimal characteristics. Although lightness and strength, as well as the availability of various shapes and colors in addition to simple assembly, provided the greatest popularity among all previous options. If there is a need for repair, then acrylic lends itself easily to this, and an additional metal frame is used to strengthen it.

Important! First of all, when assembling the pallet, you need to protect your hands with gloves, because the back of this element is covered with fiberglass, which can easily penetrate the skin.

Steps for direct assembly of a reinforced pallet:

  • First you need to turn the pallet upside down. (It is better to remove the protective film later so as not to scratch the surface).
  • Attach a metal cruciform frame to the bottom of the pallet, which is fixed with special studs. First you should try on the design so that the holes for the studs coincide with the special fasteners. Then thread the studs through the frame and place them in the holes in the pallet.
  • Screw the frame with screws.
  • Clamp the studs to the frame. They should be pressed with ordinary nuts on both sides of the frame channels - upper and lower.
  • In order to perfectly level the surface, you must use the level. This is a very important part, because tilting the pallet in one direction will contribute to the outflow of water onto the floor.

Important! The cruciform frame can be screwed to the pallet only in embedded places - bulges, where chipboard is “hidden” inside. This will allow you to securely attach the reinforcing element without the risk of piercing the pallet itself with a screw.

Apron assembly

When installing this component, one important detail should be considered. The support legs should be just below the edge of the apron so that the weight of the structure falls on them. Otherwise, the plastic of the apron simply cannot withstand the load and will crack.

  • First, along the entire rim of the pallet, small brackets should be attached with self-tapping screws.
  • Then, put the upper part of the apron in the above-described fasteners.
  • Place the bottom brackets near the support legs, which must be tightened with nuts.
  • Screw the apron to the bottom brackets. Close the screws with decorative shiny plugs.

Drain fixture

For the convenience of the process, you can attach the drain hose in the following step:

  • It is necessary to turn the pallet on its side;
  • Insert the bottom valve from the front side;
  • On the reverse side, put an elastic band and secure it with a plastic mount;
  • Connect a corrugated drain hose, the length and direction of which can be easily adjusted.

Subject to the instructions, a moderate tightening of the rings (without overtightening!) Should ensure complete tightness. However, for verification, it is still necessary to close the lower end of the corrugated pipe and fill the system with water in a small amount. If there are no leaks, then you can connect it to the general structure.

Installation of the upper part of the cabin

By simple steps, you need to assemble the upper part of the shower cabin:

  • First you need to decide on the lower and upper arcuate profiles. The upper one differs from the lower one in a special groove, on which the roof will subsequently be installed.
  • To the lower arc, on both sides, straight aluminum profiles should be screwed vertically.
  • Then you need to attach the upper arc for the main frame - the frame.
  • Now you can install the rear windows. Both glasses are slightly different from each other. In one of them there are two holes located horizontally - for a shelf, and in the second two vertically - for attaching a hand shower. Another important point - the glossy side of the panels is the "face", and the matte surface is the back.
  • Screwing the rear window onto the vertical side profiles. One side of each glass is flat, with holes that must necessarily coincide with the holes of the frame profiles.
  • Connecting the center panel. It is installed between the two rear windows by screwing screws into special fasteners.

Assembly of shower box components

Do-it-yourself installation of a shower cabin will be much easier if the internal parts are placed in a not yet fully assembled structure.

  • First screw on the two-position mixer. Its lower part is clamped with a screw, and the upper part with a nut. At the same time, a decorative shiny overlay is pressed at the top.
  • Then you need to install the cold and hot water switch knob. The internal shape of the hole will clearly indicate where to install it. Basically it is a square that is attached to the bottom switch. At the end of the installation, be sure to tighten the handle with a small nut located under the decorative cap.
  • Then you should put the adjustment knob, which directs the water either to the hand shower or to the overhead rain shower. The inner hole of such a handle will be round and, of course, will already be located on the top of the two-position mixer. For the normal functioning of this part, tightening the nut is a necessary step.
  • Now you need to put the fitting to connect the hand shower. It is threaded into the provided hole and fastened on the back side with a plastic nut.
  • In order to attach a shelf, you first need to install a mount for it.
  • The shower holder is screwed into the pre-drilled holes to the back glass.

Installation of front doors and roof

Not all consumers know how to install a shower cabin without damage. To do this, you just need an assistant to move bulky parts.

  • First you need to install the upper part of the shower cabin on the pallet and carefully fasten it with self-tapping screws.
  • Then install flat front windows. They need to be “dressed” in a rubber seal, and then put in the groove of the lower profile, upper and, finally, side. Be sure to tighten the mounting bolts to tightly fix the glass.
  • Now you need to assemble the movable glass shower. They have holes for mounting rollers. The edge to which the holes are located very close will be located in the middle of the valves. And for rollers there are differences - in the lower ones, the adjustment will not be automatic, but manual. Rollers are installed from the front of the door, two on each side - top and bottom.
  • Then it is necessary to put seals to protect against water leaks and handles.
  • When installing the roof, it should be noted that a decorative ventilation trim and a rain shower must be attached to it, which is threaded through the central hole and fixed from the back.
  • After installing the overhead shower, you need to connect a flexible water hose to its “leg”.
  • A water hose is also needed for the hand shower.
  • We attach both free ends of the flexible hoses to the back of the two-position mixer.

On this, the assembly and installation of the shower cabin is considered complete.

Features of connecting a shower cabin

The shower cabin can be connected to two main systems.

Electrical connection

Such a connection requires a powerful three-core cable with a minimum cross section of 2 sq. mm.

Sewer connection

For normal flow, it is necessary to place a pipe leading to the sewer with a slight slope. However, if you install a shower siphon above the drain, all the water will drain naturally.

Many people prefer high-tech, arranging a very attractive multifunctional set in the form of light and sound aromatherapy, hydromassage and a steam bath to a classic spacious bath or a compact shower corner.

In addition, the high optional density does not prevent the implementation of a full-fledged installation cycle on your own.

.
How this article and its content will be useful:

Shower cabin installation diagram and installation specifics

The operation of assembling a shower stall is conditionally divided into several stages where the installation takes place:

  • pallet;
  • side panels;
  • doors;
  • roofs;
  • additional equipment providing water and electricity supply.

Pallet installation

Absolutely any shower cabin installation diagram initially provides for the need to install a pallet. The operation is performed in the following sequence:

  • a power frame and studs are attached to the assembly unit, which later also perform the function of legs;
  • the pallet is equipped with fittings for draining and a siphon;
  • by adjusting the height of the legs, the structure is aligned with the floor;
  • the drain system is checked for leaks.

When organizing a drain system, the following should be considered: recommendations:

  • the pallet must be guaranteed above the level of the sewer pipes;
  • the channel connecting the siphon of the pallet with the sewer system must be laid with a slope to ensure the possibility of spontaneous movement of the liquid;
  • in the case of a remote location of the cabin and the sewer drain, the drain system should be equipped with a pump;
  • joints of system elements must be treated with sealant.

Assembly instructions for side panels and doors

Traditionally vertical panels fastened directly to the previously installed pallet using bolted connections. The joint is pre-treated with a sealant.

Important! The maximum deviation of the cabin walls from the vertical position should be no more than 5 cm.

A multifunctional shower rack is attached to the fixed panels using self-tapping screws.

The subsequent installation of the shower cabin according to the video proposed below consists in assembling the door frame. The latter is a system of vertical racks and, often, two horizontal guides. The mounted frame is fixed relative to the pallet and vertical panels.

Door installation booths are made in accordance with the following technology:

  • the upper rollers are set to the maximum upper vertical position;
  • silicone seals are installed;
  • the door is mounted in the frame - the lower rollers (by pressing they move along the vertical) are refueled into the corresponding guide;
  • door handles and other fittings are fixed.

The doors are subject to adjustment: by turning the adjusting screws of the upper rollers, it is necessary to achieve a tight closing of the leaves and free movement of the elements along the guides.

Ceiling panel installation

The roof of the shower cubicle is pre-equipped with integral elements of optional systems:

  • watering can;
  • fan;
  • backlight;
  • speaker.

The resulting assembly unit is based using a sealant on a support formed with the help of side panels and a door frame and fixed.

Supply of communications and video of all stages of installation of a shower cabin with your own hands

Water connection It is made by flexible eyeliner and shutoff valves. It is strongly recommended to use a filter element in the water supply system.

For your information! If you have hydromassage options in your arsenal, you should pay attention to the required water pressure at the inlet. Usually this value is at least 2 atm.

Electricity supply in the installation schemes of various shower cabins, special attention is paid. The generalized system of requirements for the technology of connection to the power grid is based on the following principles:

  • a waterproof socket is installed;
  • protective automatic shutdown of power supply of a booth is provided;
  • a separate cable is laid from the switchboard.

Before organizing the power supply system, it is necessary to calculate the cable cross-section required for the power of the booth (usually at least 2.5 mm²). Preventive measures to protect the circuit from short circuits and electric shock to a person can be provided by installing or a residual current device paired with a circuit breaker, or a differential machine.

The outlet is supposed to be based behind the booth at a distance of 220-230 cm from the floor. It is allowed to use products with a water protection class of at least 4 (IP X4). When choosing from two ways to install the product (open or hidden), hidden should be preferred.

The causes of some possible malfunctions that occurred during installation, see the table:

Attached installation video of a conventional shower cabin clearly demonstrates the key stages of the process of its assembly and installation.

  1. Tray installation. The design is equipped with a frame, drain fittings, siphon; checked for tightness and adjusted relative to the floor.
  2. Fastening side panels to the pallet.
  3. Shower panel installation.
  4. Assembly and installation of the door frame.
  5. Installation and adjustment of doors.
  6. Assembly and installation of the ceiling panel.
  7. Water supply.
  8. Organization of the power supply system.

Upon completion of the work, test tests are carried out, analyzing the tightness and stability of the booth, the performance of the drain system.

In this article, the site proposes to consider the process of assembling and installing an acrylic bowl, walls and shower cabin fittings. We have provided detailed instructions and video tutorials for beginners. The article is a manual for assembling a standard hydrobox with side walls and additional equipment.

The shower cabin is becoming more and more popular due to the lack of free space in apartment bathrooms and its versatility. Installing a shower cabin with your own hands is not difficult for someone who has basic skills in working with conventional tools. This work can be performed at different stages - for example, only installation, connection, laying of water supply and sewerage, or all together.

These products have several degrees of difference, on which their price primarily depends. Below are their signs.

Pallet design

The pallet can be either built into the floor or outdoor. In real practice, 70% of installed pallets in apartments are outdoor.

Presence of walls

Economy shower enclosures do not have factory back and side walls - their function is performed by bathroom walls finished with waterproof material. Their installation is the easiest, you only need to install the pallet and fix the door profile. For these products, installing a shower cabin with your own hands does not present any particular difficulties.

Models with walls are an independent structure, made in the same style. They are more expensive due to the larger number of elements. In addition, their installation is more complicated and requires precision and accuracy.

Optional equipment

Factory back walls give the advantage of protecting the walls of the room, as well as a bosom in which auxiliary channels and devices can be placed. The most advanced models are equipped with massage nozzles, various shower devices, fittings and electronic control. Such cabins are called "hydroboxes" and they occupy the top positions in terms of price.

How to install a shower cabin yourself. Operating procedure

The path from a set of parts in a cardboard box to a working device (device) consists of several stages.

"Zero stage" - preparation. The sequence of actions is as follows:

  1. Determination of available dimensions and pallet area.
  2. Determination of water inlet and outlet points.
  3. Selection of a model that meets real requirements (pallet size, feature set).
  4. Additional installation of water supply and sewerage for the selected model.
  5. Alignment and sealing of the installation site of the pallet (if necessary), the connection points of the water supply and sewerage must be accessible after installation.

The choice of model is extremely important. To make sure you get exactly what you need, try to find a real working sample and try it out.

After clarifying the eyeliner and purchasing the product, you can proceed directly to the installation. The instructions for assembling the shower cabin, which is necessarily attached to each product, will help you with this.

Video on self-assembly and installation of a shower cabin:

Pallet assembly

Most standard mid-range pallets combine the following features:

  1. Angle design.
  2. Acrylic bowl on a metal profile frame.
  3. Separate panels covering the inside of the pallet.
  4. Height 450-550 mm.

The main elements of all pallets are the same regardless of other parts (walls, doors), so the assembly of the pallet is a standard procedure.

Operating procedure:

1. Install the acrylic bowl upside down next to the mounting location.

2. Set the bowl screen to the design position (under the bowl rim).

3. Fix the screen tabs on the self-tapping screws - the panel should be held without backlash and gaps.

Note. In places where other elements are attached to the bowl, there are always thickenings (under the self-tapping screw) or embedded parts. This must be indicated in the instructions.

4. Try on a metal frame. Its ribs should match the bulges at the bottom of the bowl.

5. Pass a threaded rod (Ø 14, included) through the mounting holes and screw it into the seats until it stops. Install restrictive locknuts and adjust the gap between the frame and the bottom 15-20 mm.

6. Apply silicone sealant to the contact points of the profile with acrylic and firmly press the frame against the bowl with locknuts. Also install studs in free consoles.

Attention! The tightening force is not critical. Try not to tear out the embedded parts.

7. We install plastic screen stops on the front row of studs. Sometimes they are pressed with screws.

8. We wind the legs.

9. Install the siphon and drain fittings.

Attention! Use silicone and winding. The connection must be very reliable, since the place of a possible leak is outside the visual access zone.

10. We install the pallet in the place of constant use, and make fine adjustments to stability (tighten the legs).

11. We connect and test the sewerage.

On such a pallet, you can install any walls that are suitable in size.

Wall preparation and installation

Before installation, make sure that the complete set corresponds to the documents. If you decide to assemble a shower cabin with your own hands, you will have to study each step. The assembly of wall parts is a crucial stage, since possible troubles will be hidden from view. All connections of tubes and wires (if any) must be made strictly according to the instructions.

Attention! Do not rely on intuition when assembling economy segment products. Consult with experienced craftsmen who know how to assemble a shower cabin. Videos and forums on the Internet are also very useful and visual.

Video - how to assemble the back panel of the shower cabin:

After the preliminary installation of the equipment, the walls should simply be installed in the seats. Sometimes they have factory holes, sometimes they don't.

We push the finished structure into the corner until it stops and put the upper plugs of the sinuses. This should be done carefully. Then you need to adjust the legs again in place. Test the pallet for stability.

Portal installation

The frame with the profile along which the doors go can be independent, or it can rest on the wall of the room. Regardless of the design, the assembly principle is approximately the same:

  1. Assemble the frame or install the top and bottom rails.
  2. Alert the doors - hang fittings, rollers.
  3. Install fixed walls (if any).
  4. If there is a side profile, install it through silicone.
  5. Put the doors in the design position.
  6. Check the course, adjust the guides.
  7. Add waterproofing silicone fittings - valves, aprons, plugs.

After all these operations, if they are performed correctly, you can connect the water and use the shower.

Prices for shower cabins

It is very difficult to predict the exact price of a model with certain properties. The quality of the materials is of decisive importance, which directly affects the durability.

So, for example, a shower cabin made of high-quality thick plastic with one function (shower) produced by the EU will cost the same as a Chinese hydrobox of the maximum configuration - from 15 to 50 thousand rubles.

Note: shower cabins, which are in the lower price category, have a real service life of no more than 10 years with daily use by two people. Keep this in mind when choosing and using your shower enclosure.

More complex models with many adjustments, a large bowl, a jacuzzi will cost 50-150 thousand rubles. (depending on the manufacturer). In the price category 150-250 thousand rubles. there are reliable products that have an exclusive design or are completely made to order.

The manufacturability of hydroboxes is simply amazing - there are models with the function of an infrared sauna or even a Turkish bath. Their price starts from 300 thousand rubles.

rmnt.ru, Igor Maksimov

If there is not enough space, then it is better to refuse a bath in the washing room, since it is much more practical to assemble a shower cabin, especially since they have now become more affordable. But is it really possible to do it yourself without the involvement of specialists?

We are not talking about monolithic, assembled, but about ordinary, assembled, which are especially popular with owners of small city apartments, for example, the manufacturer IKA. Corner showers also belong to these devices. The whole device is not so complicated as to be considered something fantastic, and consists of the following "cubes": the upper part (dome), the lower part (tray), the rear part with side walls, sliding doors, screen, vertical racks.

Shower cabin device

The times when each of us single-handedly dragged such bulky structures from the store to the house have inevitably passed. However, you should not show too much confidence in the delivery service. As soon as the kit is delivered to you, carefully inspect the above parts for their integrity in the presence of movers. It is especially meticulous to study the glass components, which, although made of a fairly durable composition, still require a special attitude towards themselves both during transportation and during assembly.

It goes without saying that you need screwdrivers, drills and other standard tools. But there are still several important components, without which you can not even start reading how to assemble a shower cabin:

  • an additional siphon (this part is usually included in the kit, but its quality is usually not as expected);
  • silicone sealant;
  • sealing thread, fum tape or tow;
  • building levels of various lengths (2 or 3 pieces).

Shower cubicle assembly tools

After you have prepared a box with a carpentry tool kit and the above “add-ons”, start assembling the cabin. It should be noted that the components are best connected in the room, because many bathrooms are too compact and assembly directly on site will only bring inconvenience. Let's move on to the instructions.

Collecting in the right order

Now we will go through the steps all the way, how to assemble a shower cabin, we will try to foresee all the inconveniences and possible mistakes.

How to assemble a shower cabin with your own hands - step by step diagram

Step 1: Pallet

The tray must be handled with gloves. It is made of fiberglass, and it is possible to seriously injure the hand by driving a splinter under the skin. There is a warning about this in all instructions. Line the floor with something to prevent scratching or damage, then place it upside down on this mat. Taking long threaded pins, which will later be used as legs, screw them into the existing sockets. Typically, IKA cabins include four such parts. Some types of pallets are made of acrylic, and therefore the kit may include a special frame that increases the strength of the structure. In this case, all the holes are already prepared, and the assembler only needs to install the necessary fasteners in certain places.

After all the details of the legs are assembled, and they themselves are attached to the base, you can install the siphon and corrugated pipes. Now the complete part of the shower cabin should be hoisted to the place in the bathroom where it will be for the next few years. The corrugated tubes from the siphon are connected to the appropriate drains, and the legs must be adjusted using the levels laid on top so that the horizontal position is as close to ideal as possible. Install a decorative screen on top of the pallet.

Note:

  • The place on which the pallet is to be installed should also be as carefully leveled as possible.
  • It would also be useful to waterproof the threaded connections of corrugated pipes with a siphon and drain holes using a sealing thread, fum tape or tow.
  • When assembling the frame, it will be very good if sealing foam gaskets are made between it and the pallet.
  • Corrugated hose is best bent into a horseshoe shape to block odors from the drain.
  • The decorative screen should be installed after the horizontal level has been adjusted and the tightness of the drain device has been carefully checked.

Step 2: Walls

You may be repelled by the idea of ​​​​assembling a shower cabin with your own hands just because the elegant system of functioning of the walls seems complex and requires careful debugging. But there will not be any particular difficulties here either. Any instruction indicates how to install and align the grooves and spikes. The rigidity of the structure is achieved after all the connecting bolts are tightened. At first, they only need to be baited, and finally twisted after all the elements are fitted.

If the walls are made of thick tempered glass, use extreme caution when assembling.

It is best to mark the top and bottom sides immediately after unpacking so as not to create additional risk when moving elements. Please note that the thin part of the walls with many holes and cutouts is always installed down. The glass component is fixed after a sealant is put on its edge from below, and silicone sealant is placed in the tray groove. Then you should tighten the bolts and leave the walls alone until it is completely hardened.

Note:

  • Racks must be fixed with screws both at the top and at the bottom.
  • Fasteners should be tightened carefully and evenly, as there is a possibility of damaging the glass.
  • Apply the sealant carefully so as not to block the drain.
  • Excess silicone is easily removed with soapy water, and then it is enough to wipe the place where it was with a clean cloth.
  • When installing the seal, the tab should be directed inward.

Step 3: Doors

The smooth movement of the doors is ensured by the rollers, which are mounted on metal holders with rubber inserts, hung on the top and bottom of the doors. Here also, you should not overdo it with tightening the screws. After assembly, the movement of the doors is checked, and if it is necessary to make efforts, it is necessary to adjust the lower rollers using the existing eccentrics. To make the doors close more tightly, magnetic latches are also installed on their edges.

Step 4: Dome

The assembly is considered complete when the dome is installed, communications with cold, hot water and electricity are connected, shelves and fittings are installed. Before installing the dome, it is necessary to mount the provided devices: speaker, fan, watering can and backlight. To prevent the speakers from rattling, you can lubricate the gap between their edges and the case with a thin layer of sealant. Seals are installed after the doors are equipped with rollers. Do not forget about the screw caps for the rollers, otherwise the screws on which the wheels are fixed may rust. The junction of the cabin and the rear panel must be additionally treated with silicone.

What to do after assembly?

We already know how to properly assemble a shower cabin, now consider the criteria for checking our result. After the final installation of the entire device in its place, check once again the operation of all communications. Also, several times go into the booth, checking the horizontality and ease of movement of the doors. There should be no extraneous crunches, swings and jamming. If the IKA cabin is assembled correctly, no additional fastenings to the floor and walls of the bath are necessary.

When installing a corner cabin, not only the evenness of the floor, but also the walls of the bathroom is required. Before purchasing the product, it is desirable to carry out the necessary work to level the surfaces. If there is no confidence in the reliability and stability of the assembled structure, you can fasten the legs to the floor tightly, and additionally attach the booth to the wall (although this will be redundant).

If you think that the fastening of the dome is not too reliable, you can additionally fix the part with self-tapping screws. The main thing is not to get carried away, since the cabin material is also very fragile, and any crack is a gap in the overall tightness. When connecting communications, special attention should also be paid to electrical insulation. Do not pinch the wires or let water enter the connection points.

A do-it-yourself shower stall will not only make your stay more comfortable, but will also save you money. Homemade boxing will save you from the cost of attracting third-party and not always conscientious workers. Equally important is the moral satisfaction received from the results of their work. Is it true?

We will tell you how a shower cabin should be built in a private house with your own hands, we will help you in choosing the best plumbing fixture. We will show you how to develop a project and bring the idea of ​​\u200b\u200bbuilding a hygienic homemade product into reality.

In the article presented by us, the process of building and arranging a shower is described step by step. The technology for installing the booth and connecting it to the sewer largely depends on the chosen modification of the pallet.

Before proceeding directly to the description of the assembly process, we will briefly consider the main types of shower stalls available for sale, the criteria for their selection.

Variety of models: what is better to choose

A shower enclosure is a simple construction of a pallet and curtains. Instead of the walls that are typical for a full-fledged shower stall, the walls of the room are used. There is no ceiling in the shower area. Its main advantages are low cost and compactness.

Shower enclosure - one of the simplest, most convenient and cheapest models of shower cabins, takes up minimal space and is suitable for self-assembly

More "fancy" models have a roof and walls. Expensive multifunctional units have rich technical equipment: Turkish bath or Charcot shower, flavored steam mode, different types of hydromassage, additional functions, various lighting.

An expensive model of a shower cabin with a hydromassage function, lighting and a deep tray. Requires not only sufficient space for installation, but also the necessary pressure in the water supply

The control of such booths is carried out by a complex electronic system. Before buying an expensive cabin equipped with a hydromassage function, you first need to find out the level of water pressure in the pipes.

Combined showers are a kind of compromise for those who like to take a bath with a hydromassage and have a full-fledged shower at home. Combined models are distinguished by an original and stylish design - they are often positioned on the market as home SPA centers.

It is to the pallet that the products impose increased requirements. A high-quality pallet must withstand a large load, and at the maximum allowable weight of the user, it must not crack, bend or deform.

Shower trays are made from different materials.

Most popular models:

  • faience;
  • from artificial stone;
  • enamelled;
  • acrylic.

Faience. Everyone knows the material used in the manufacture of toilet bowls. The earthenware tray is completely hygienic, easy to clean and can withstand a lot of weight.

The disadvantage of faience is the strong “causticity” of the material: the surface of the pallet can be damaged even if, for example, a glass cup falls

Fake diamond- reliable and durable material, beautiful and hygienic, but expensive.

Enamelled pallets for shower stalls are cheap and durable. Of the shortcomings, only the fragility of the enamel should be noted. However, the enamel coating can be easily restored or replaced with acrylic. An additional minus is the roar of falling water on the metal surface of the pallet.

Acrylic pallets are the most popular. The acrylic surface does not absorb dirt at all, warms up instantly, does not darken over time.

Scratches on acrylic are completely invisible - this is an important point, since trays are often scratched when a shower cabin is assembled by hand, especially for the first time.

The disadvantage of acrylic pallets is the inconvenience in installation, since the installation of a special frame is required. As such, an aluminum structure with adjusting screws is used, with which you can select the desired height of the pallet.

A comparative overview of different types of shower trays is presented in.

What are curtains?

The second most important element is the cabin curtains, which can be hinged and sliding. Swing doors require more space. They are single-sided and double-sided.

As for sliding curtains, they have from two to six wings, which are held by a rubber magnetic tape. The curtains move on rollers hidden inside the frame of the shower cabin. High-quality curtains should open and close almost silently.

Corner shower cubicle with sliding doors. In addition to models with transparent plastic (glass), there are options with frosted curtains.

Shower curtains are made of polystyrene or high quality tempered glass. Products made of polystyrene are quite cheap and have a small weight, but they quickly lose their transparency, stains remain on them.

Glass curtains are expensive high-quality products.

Hinged doors made of tempered frosted glass. In their manufacture, specially processed safety glass is used, which surpasses even automotive glass in strength.

Water and dirt are very easily washed off the glass surface - the material does not absorb anything and does not fade over the years. You can also buy a booth with curtains made of classic transparent, tinted, colored and rough glass.

Shower project development

With apparent technical complexity, the independent construction of a shower cabin is, in fact, quite a feasible procedure for a simple layman, especially for a hard-working owner.

Just as the construction of any capital structure begins with the development of a project, it is necessary to think over before starting work on equipping a shower in a private house with your own hands.

It is advisable to mark on paper the main plans and schemes, for example:

  • a plan for placing a shower cabin in a designated room;
  • schemes for connecting to power supply networks, water supply and sewerage;
  • the procedure for equipping the shower room with a ventilation system.

The preparation of the room for the shower and the direct arrangement of the cabin in it are carried out in several stages.

 
Articles By topic:
Pasta with tuna in creamy sauce Pasta with fresh tuna in creamy sauce
Pasta with tuna in a creamy sauce is a dish from which anyone will swallow their tongue, of course, not just for fun, but because it is insanely delicious. Tuna and pasta are in perfect harmony with each other. Of course, perhaps someone will not like this dish.
Spring rolls with vegetables Vegetable rolls at home
Thus, if you are struggling with the question “what is the difference between sushi and rolls?”, We answer - nothing. A few words about what rolls are. Rolls are not necessarily Japanese cuisine. The recipe for rolls in one form or another is present in many Asian cuisines.
Protection of flora and fauna in international treaties AND human health
The solution of environmental problems, and, consequently, the prospects for the sustainable development of civilization are largely associated with the competent use of renewable resources and various functions of ecosystems, and their management. This direction is the most important way to get
Minimum wage (minimum wage)
The minimum wage is the minimum wage (SMIC), which is approved by the Government of the Russian Federation annually on the basis of the Federal Law "On the Minimum Wage". The minimum wage is calculated for the fully completed monthly work rate.